Sinclair ASE-24AH Manual de servicio Pagina 35

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 46
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 34
For construction convenience, before laying pipes, use insulation material to insulate the pipes to be deal
with, at the same time, at two ends of the pipe, remain some length not to be insulated, in order to be welded
and check the leakage after laying the pipes.
5.2.3. Insulate for the jointing area, expanding area and the flange area
Insulate for the jointing area, expanding area and the flange area should be done after checking leakage
of the pipes
Make sure theres no clearance in the joining part of the accessorial insulati on material and local
preparative insulation material.
5.3 Drainage pipe insulation
The connection part should be insulated, or else water will be condensing at the non-insulation part.
5.4 Note
5.4.1 The jointing area, expanding area and the flange area should be heat insulated after passing the
pressure test
5.4.2 The gas and liquid pipe should be heat insulated individually, the connecting part should be heat
insulated individually.
5.4.3 Use the attached heat-insulation material to insulate the pipe connections (pipes tie-in ,expand nut ) of
the indoor unit
6. Wiring
Please refer to the Wiring Diagram.
Vista de pagina 34
1 2 ... 30 31 32 33 34 35 36 37 38 39 40 ... 45 46

Comentarios a estos manuales

Sin comentarios